Successful Re-Conductoring of Mahasthangarh-Palashbari CKT-1_132kV Transmission Line – A Route Map Overview & Completion Details

Route Map: Re-Conductoring of Mahasthangarh-Palashbari 132kV Double Circuit Transmission Line

πŸ“„ Contract No: PGCB/ADB/L3683-BAN/SWTGEP/230kV & 132kV/TL
πŸ“… Contract Date: 27 April 2023
πŸ“ Project Name: Construction of Notun Bidyut Power Plant – Char Fasson 230kV Transmission Line and Reconductoring of 230kV & 132kV Transmission Lines on Turnkey Basis (Package-7)
πŸ“Œ Title: Route Map – Re-Conductoring of Mahasthangarh-Palashbari 132kV Double Circuit Transmission Line
🧭 Drawing No: Mahasthangarh-Palashbari 132kv DC TL (Tower No. 1 to 125)
πŸ“… Document Date: 20 May 2023


πŸ”§ Work Details – CKT-1

  • Total Length: 36.417 km

  • Shutdown Received: 10 Feb 2025 at 12:30 PM

  • Circuit Energized (CKT-1): 08 March 2025 at 2:00 PM

  • Section Ready (Mahasthangarh-Palashbari 132kv DC TL): 4 March 2025


πŸ—ΊοΈ Interactive Route Map – Mahasthangarh-Palashbari (132kV Line)

Below is the interactive KML-based map showing the full transmission line route from Mahasthangarh-Palashbari (Tower No. 378C to 276)

πŸ“ View Route Map:

This map clearly highlights each tower location, alignment path, and the entire project stretch β€” built using KML data for maximum accuracy and visibility.


πŸ—οΈ Our Achievement

We have successfully completed the reconstitution work of the Ishwardi–Natore 132kV transmission line ahead of schedule and with zero accidents, ensuring 100% safety and top-quality execution.

Currently, CKT-2 of this line remains operational. Our team is dedicated, skilled, and efficient in handling high-voltage transmission line projects.


🀝 A Message to Our Client – KEC International Limited

We sincerely thank KEC International Limited for entrusting us with this vital project. We are confident that our performance speaks for itself, and we remain hopeful and prepared to take on future assignments with the same level of commitment and excellence.


πŸ“’ Work Order Invitation

We are now inviting other companies to collaborate with us for transmission line reconstitution and supervision work. Let us power your projects and help build a brighter, better future together.